Construction of a nuclear power plant in Bangladesh!
St. Petersburg, pr. January 9, d. 18, letter A
8 (800) 555 19 28 free call
8 (812) 313 28 93 office phone
Заявка на сервис
Construction of a nuclear power plant in Bangladesh!

Construction of a nuclear power plant in Bangladesh!

Details

Date:
29.07.2020

Several units of the GS line of vacuum grippers went to the construction of a new nuclear power plant in Bangladesh. Participation in a major international project became possible due to the unique features of the equipment.

First of all, this is the ability to perform work at temperatures up to +50° C and a modern drainage system that allows installation work in all weather conditions, which of course is a constant plus for working in a hot and humid climate in a country where the rains can go for several months, and the heat can melt the asphalt.

Thanks to a four-level safety system, namely a backup vacuum storage, sound and light alarms, as well as safety slings, the vacuum equipment meets all international standards for safe operation.

The GS line's vacuum gripper can mount any smooth, non-porous surface, including glass and sandwich panels. Thanks to its compact size and light weight, the equipment is easy to operate on the construction site: it is easy to manage and move with a special transport stand.

The remote control that all the Arlift vacuum grippers are equipped with significantly speeds up and simplifies the installation process. To speed up the operation of the equipment, the 360° rotation function is also provided with a lock for every 90°, which allows you to turn the glass without re-grabbing from the transport position to the mounting position.

Autonomous operation during the entire work shift and fast eight-hour battery charging allows you to effectively use the full working potential of the equipment, avoid downtime and meets all modern standards for building installation.

We know that we will not be ashamed of these "compatriots".