31/08
2016
The glazing work was done using a mini-crane SPX1275.
30/08
2016
Installation of metal structures in the construction of a pedestrian crossing through the third transport ring in Moscow using a mini-crane SPX 527.
24/08
2016
With the help of the vacuum grips Glass Boy and Clad Boy, a warehouse complex with the area of 17 000 square meters in the city of Astana was erected.
18/08
2016
The company JEKKO participated in the construction of the world's largest glass building – the sphere "EXPO 2017" in Astana.
12/08
2016
The installation of enclosing structures in the form of sandwich panels was carried out using the APLIFT vacuum gripper CladBoy3.