Installation of double-glazed Windows mini-crane Jekko SPX527CDH with a jib
About the project
The city:
Moscow
Object: Aqua Complex, Luzhniki stadium
Type of work: Glazing
Palace of water sports in Luzhniki will receive first visitors this autumn. At the final stage of construction, the company Arlift made installation of windows weighing from 400 to 600 kg. The installation was made at a height of 16 meters.
Mini-crane SPX527CDH with a hydraulic jib and a vacuum grippew ARLIFTER GS-850 (vacuum equipment purchased by the installation company) were connected.
A team of 4 people was involved in the work. 60 windows successfully mounted in 7 working days.
The SPX527CDH mini-crane is one of the most popular models in Russia, as it successfully combines maneuverability and load capacity.
- maneuverability
- carrying capacity up to 2.7 t
- availability of remote control
- light weight
- non-marking caterpillars
- stabilization system and LMI (display load moment, stall prevention, control of separation of the outriggers)
- continuous rotation