Installation and finishing works of the fair Novokosino in Moscow
Object: Fair in Novokosino, Moscow
Type of work: Frame installation, finishing works
Implementation: In the framework of the project for the preparation of a weekend fair in Novokosino, Jekko SPX527 and Jekko SPX1040 mini-cranes, as well as the Bluelift C-13 spider tower, carried out the installation of the framework of the fair, the painting of buildings and their decoration.
More precisely: The mini-cranes Jekko SPX527 and Jekko SPX1040 made the installation of the frame, designed for the fair tent.
Spider-tower Bluelift C-13 made the interior trim of the pavilion of the fair, the installation of lighting and electrics, as well as its decoration.
The main advantages of mini-cranes and spider towers are:
- Compactness ensures the throughput of technology in doorways in the working and folded state,
- Intelligent control system, shows all the necessary technical parameters and characteristics during the execution of works,
- Lightweight allows you to use the equipment on roofs, floor slabs and indoors,
- Non-marking tracks allow you to move on delicate surfaces without damaging them,
- Load capacity - from 2.7 to 4 tons at full boom outreach,
- Area stabilization allows them to work in limited space spaces.
Within two months, a complex of works was performed to open a weekend fair in Novokosino thanks to the ARLIFT technique, and the customer, EVENTINVEST, is not the first to see that our equipment is the most reliable and multifunctional.