Traverse, vacuum grippers and mini crane Arlift.
St. Petersburg, pr. January 9, d. 18, letter A
8 (800) 555 19 28 free call
8 (812) 313 28 93 office phone
Заявка на сервис
Traverse, vacuum grippers and mini crane Arlift

Traverse, vacuum grippers and mini-crane Arlift

About the project

The city:
Moscow

With the development of modern technologies, the construction of low-rise buildings has reached unprecedented proportions. If earlier panoramic glazing caused a lot of questions, then with the advent of technology, experience and a modern approach to construction, it has become a familiar phenomenon for many private developments. However, the installation of large-sized or heavy-weight glasses is still associated with a number of issues and difficulties. But, there is a solution!

So, in one of the settlements of the Moscow region, the Arlift equipment mounted a double-glazed window weighing about 1 ton with the help of two Arlifter GS-850 vacuum grippers, a special traverse and mini-crane SPX527.

Vacuum grippers of the company's own production, designed and assembled in St. Petersburg, comply with GOST and are adapted to work in harsh Russian weather conditions. The dehumidification system allows you to carry out work both in the rain and in the snow. Thanks to the built-in battery with a large capacity, the equipment can be used during the entire work shift without additional recharging. To perform various tasks, including to increase the load capacity, it is allowed to use two or more vacuum grippers on the traverse.

Mini-crane Arlift SPX527 is one of the most popular types of equipment for low-rise construction. Firstly, this is facilitated by maximum cross-country ability both folded and in working condition, and secondly, soft rubberized tracks, low own weight and excellent load capacity. In addition, to perform a number of tasks, the mini-crane can be equipped with additional equipment: grabber, goose, vacuum grippers.

The operation of the equipment in tandem, as well as the rental of equipment in one place will help significantly save time, budget and save the nervous system of the construction team and the customer.