CERAMIC FACTORY, ACTOBE
About the project
The city:
Aktobe
Category:
Vacuum grippers
Technic:
VACUUM GRIPPER ARLIFTER SP-4 / SPD-4 (WALL + ROOF)
Object: Ceramic factory, Aktobe
Type of works: roof and wall sandwich panels installation
Implementation: roof and wall sandwich panels installation was carried out as a part of the ceramics factory construction in Aktobe.
Installation of the roof sandwich panels with a length of 12 meters and wall sandwich panels with a length of 6 meters (horizontal installation) was made by vacuum gripping CladBoy4.