CONSTRUCTION OF THE SHOPPING CENTER, ALMATY
About the project
Category:
Vacuum grippers
Technic:
VACUUM GRIPPER ARLIFTER SP-4 / SPD-4 (WALL + ROOF)
The vacuum gripping Clad Boy 4 was used to install sandwich panels. That work was a part of the large shopping centerconstruction in Almaty.
Types of works performed by ARLIFT technique:
- horizontal installation of sandwich panels (length 6 meters)
- installation of the roof (length 12 meters).
Work was carried out with in one month.