Glazing of the new airport terminal in Astana
St. Petersburg, pr. January 9, d. 18, letter A
8 (800) 555 19 28 free call
8 (812) 313 28 93 office phone
Заявка на сервис
Glazing of the new airport terminal in Astana

Glazing of new airport terminal in Astana

About the project

The city:
Astana

Object: Airport Terminal
Type of work: Glass installation
Task: Perform exterior glazing of the new airport terminal with glasses weighing 700 kilograms.

Implementation::
In recent years, Kazakhstan has been developing and building up at a cosmic pace. As an indicator can be a huge number of structures built despite the swiftness of European standards.


ARLIFT company always takes part in the construction of the largest objects of the Republic of Kazakhstan, including

This time we were faced with the task of carrying out a complete external glazing of the new terminal of the airport in Astana with glasses weighing 700 kilograms. To solve the problem, it was decided to use one of the most popular vacuum grippers in our range – ARLIFTЕR GS-750.

Why the vacuum capture ARLIFTER GS-750?

  • Installation of not only glass weighing up to 750 kg, but also sandwich panels up to 8 m long.
  • Small size.
  • The presence of the weight bracket, which allows you to maintain a perfectly flat position of the mounted surface.
  • Work in all weather conditions.
  • Availability of remote control.
  • 360 degree rotation with fixation for every 90.

The works were completed within a few days.
Now, the new airport terminal is fully glazed!