Roof and wall mounting sandwich panels in Kazakhstan
Object:
GOK (Mining and Processing Plant), the village of Zarem, Kazakhstan
Type of work:
Roofing and wall installation of sandwich panels
Implementation:
As part of the construction of the mining and processing plant in the village of Zharem in Kazakhstan, roofing panels up to 8 meters long and wall sandwich panels up to 7.3 meters long and weighing up to 200 kilograms were installed using the ARLIFTER SP-4 vacuum gripper.
GOK is a combine for mining and processing minerals. The construction of GOKs is due to the fact that due to the large amount of raw materials produced, it is necessary to process them as soon as possible to increase the quality of the content of useful components. For mounting GOK-a was used one of the most popular grips in the lineup.
Vacuum capture of ARLIFTER SP-4 possesses the following features:- Work in various temperature ranges from -20 to +50
- Availability of dehumidification and air filtration systems, allowing work during heavy precipitation
- Vacuum backup storage
- Sound and light security system
- Installation of sandwich panels up to 26 meters
Within a month, wall and roof installation of sandwich panels was carried out on the territory of a mining and processing plant in Kazakhstan under construction using exclusive ARLIFT equipment.