Installation of formwork during the construction of the hotel.

About the project

The city:
Kazan

As you know, the capital of the Republic of Tatarstan is not inferior in its beauty to other major cities of the Russian Federation, so the issue of tourism, as well as the construction of new hotel complexes, is a priority for the city. The Arlift mini crane with a load capacity of up to 1800 kg helped to create a comfortable environment.

The choice for the spd360 mini-crane was not accidental — other equipment simply could not physically get to the installation site, and for work from the road, the crane did not have enough boom departure.

The SPD360 mini crane is one of the lightest in the Arlift line, weighing only 2300 kg, which makes it easy to work with floor slabs, as well as even in the most cramped conditions.

The maximum load capacity of the crane is 1800 kg, so that the 300 kg formwork was not difficult to install even at a lifting height of 8 meters. The remote control allows the operator to control the movement of cargo as much as possible, and the ability to work both from the 380 V network and from the internal combustion engine, to carry out work both inside and outside the room.

The built-in intelligent system demonstrates the operation of the crane on the site: the screen displays the boom departure and the weight of the load being lifted, which makes working with the equipment as safe as possible. The crane is protected from overloading and overturning.

Thanks to the use of modern Arlift technology, even such complex tasks can be solved with the preservation of deadlines and budgets.