Installation of floor beams on a hangar building in the art space of New Holland
Type of work: Installation of floors
Tasks: Install the floor beam
Implementation: New Holland - a unique art space in the heart of St. Petersburg. On the territory of this complex there are many premises, each of which is endowed with its own history. That there is only one sea prison "Bottle" - a building in the form of a hollow cylinder, where our mini-cranes worked for a very long period of time! We wrote about it here. The installation of metal structures inside the building in narrow aisles was performed by mini-cranes Jekko SPD360 and Jekko SPX527. And they did, really, 100%!
This time, the participation of ARLIFT in this most interesting project is remarkable in that our new product was sent to complete the task, namely the installation of a beam weighing 600 kilograms to a height of 4 meters - the Jekko JF40 mini-crane - the only mini-crane equipped with a stand for the operator.
The mini-crane Jekko JF40 entered the ARLIFT park at the end of September and a week later the technician worked on the first object!
The advantages of the Jekko JF40 mini-crane are:
- Lightweight - 1600 kg, which allows it to work on any types of surfaces without damaging them.
- Existence of a stand allows the operator to perform works directly from the crane, controlling all performed maneuvers.
- Compact size - the mini-crane can work in cramped conditions and pass through doorways.
The mini-crane Jekko JF 40 is presented only in the line of vehicles of the company ARLIFT - the market leader of small-sized construction equipment!
The works were completed in one day by the company “Spetsmontazh 55”, which is not the first time that it resorts to the use of exclusive equipment from the ARLIFT company!
We are proud that our equipment works on historical objects that are so significant for the city!