Ceiling installation and glazing with mini-crane and vacuum manipulator
About the project
The city:
Leningrad region
Object: Hotel complex
Type of work: Ceiling installation, glazing
A tourist complex on the shore of lake Ladoga is proceeding at a rapid pace. Soon it will be ready to accept the first tourists, now the company Arlift performed ceiling installation and glazing of the visor of the hotel building.
The work was carried out using a mini-crane Jekko SPD360CDH and a manipulator with a vacuum suction Cup for glass MR 800.4, which is used for precise processing and installation of glass weighing up to 600 kg. The manipulator is controlled by a remote control, to work with such equipment is enough one operator.
In total, there were about 40 glasses of various formats weighing from 200 to 350 kg. Team of 4 people was working there. The whole installation was completed in 3 days.
- Carrying capacity 1.8 t
- Max. the boom of 13 m
- Weight 2,3 t
- Drive the internal combustion engine
- The length of the hoist rope 60 m
- The area of stabilization 4000х4000 mm
- Poppy. lifting height 13 m
- Engine type diesel/mains (380 V)/battery
- Dimensions 3100 x 800 x 1990 mm
- Horizontal flight (max) 10.5 m
- Engine 14.9/20.0 kW/HP
- Fuel tank capacity 6 litres