INSTALLATION OF SANDWICH PANELS. THE CONSTRUCTION OF THE "HYPERMARKET LENTA"
About the project
Category:
Vacuum grippers
Technic:
VACUUM GRIPPER ARLIFTER SP-4 / SPD-4 (WALL + ROOF)
Installation of sandwich panels with vacuum grip ARLIFT on the construction site "Hypermarket LENTA" in Chelyabinsk.
Installation was carried out by vacuum capture Clad Boy 4.
The length of the panels was up to 11.3 meters.
That was the second time that ARLIFT took part in the construction of the hypermarket "LENTA".
Once again, the ARLIFT equipment demonstrated the highest quality and reliability.