Horizontal installation of wall sandwich panels in Rostov-on-Donu
Object: SEC "Park", Rostov-on-Donu
Type of work: Horizontal installation of wall panels
Implementation:
The shopping and leisure center Park is located in the very center of the Northern residential area of Rostov-on-Donu. With his appearance, he created a comfortable atmosphere for recreation, shopping and entertainment of residents of the district and the whole city.
This center consists of two levels on which are placed:
- hypermarket,
- shops of various brands,
- foodcourt zone,
- recreation area and entertainment center.
As part of the construction of this complex, with an area of 9,500 square meters, Arlift's company required the delivery of an external horizontal installation of 6-meter-long wall panels.
To solve this task, an ARLIFTER GS-750 vacuum gripper was sent, which, in addition to installing sandwich panels up to 8 m long, can also produce glass weighing up to 750 kg.
The vacuum sucker ARLIFTER GS-750 includes:
- dehumidification and air filtration system,
- vacuum loss compensation system,
- safety system,
- slinging system,
- remote control system (RC).