INSTALLATION OF SANDWICH PANELS IN SOCHI UNDER CONSTRUCTION OF THE ICE ARRAY "PANEL"
Object: ice arena "Puck"
Type of work: installation of sandwich panels
Implementation:
Ice Arena "Puck" - one of the largest and most significant facilities, located on the territory of the Olympic Park in the city of Sochi. Named after its shape - washers. Also outside the arena with its architecture resembles a snow whirl.
During the 2012 Olympic Games, the rent was valid for ice hockey matches, and during the Paralympic Games for sledge hockey. After the end of the Olympics, the ice arena is used as part of a sports and educational center for children.
The task of the equipment presented in the line of ARLIFT - the market leader for small-sized equipment - was to install 6-meter-length sandwich panels.
To accomplish the task, it was decided to use a vacuum gripper for ARLIFTER SP-4 sandwich panels.
We have repeatedly told you about it, because it often produces horizontal and vertical installation of roofing and sandwich panels weighing up to 1000 kilograms and up to 26 meters long (when using extension cords).
In the shortest possible time, a vacuum capture of the production of ARLIFT was carried out with the installation of sandwich panels in the ice arena "Puck" in the city of Sochi.